Baselining and change management
The View ‘Baseline Chain’ allows creating a Chain and add any kind of object in it.
Then, you can use arKItect Baseline mechanism to create revision and / or control changes on a set of objects.
You can also generate Excel or Word document with the format you configure
In view ‘Baseline Chain’, you can also add object ‘Change Request’.
In the chain, all objects will be the scope to be updated to meet a need. Once the change is validate, Change object shall be passed to “Accepted”
More information about baselining in Baseline Chains documentation
Message mechanism
Build a network easily thanks to the new Message mechanism.
Propagate data through the network, construct automatically the mux and demux that host messages and data sharing between two components.
Impact analysis of model changes in a Chain
All view where Flow Chain can be added have been updated to integrate “check chain” script.
This script analyses the model and list of candidate objects to be added to the Chain
Validation Plan
In SEA 6.3, Validation campaigns are a set of “Scenario” where you can describe all sequences of Tests / Test steps to be realized to validate your system.
More information about validation plan in Validation Plan documentation